Key Insights
The China data center construction market is experiencing robust growth, driven by the increasing adoption of cloud computing, big data analytics, and the expansion of digital infrastructure within various sectors. The market's Compound Annual Growth Rate (CAGR) of 3.54% from 2019 to 2024 indicates a steady upward trajectory. This growth is fueled by significant investments from both the government and private sector, supporting initiatives for digital transformation and economic development. Key drivers include the burgeoning e-commerce sector, the rising demand for 5G network infrastructure, and the government's focus on strengthening the nation's digital economy. The market is segmented by data center size (small to massive), infrastructure type (cooling, power, security, etc.), end-user industry (IT & Telecommunications, BFSI, Government, Healthcare), and tier type (Tier 1-4). While the exact market size for 2025 isn't provided, extrapolating from the CAGR and considering the significant investments and ongoing projects, a reasonable estimate would place the market size in the billions of USD. The large-scale data center projects and growing demand from hyperscalers are major contributors to this expansion.
Growth in the China data center construction market will continue to be influenced by factors such as government policies promoting digital infrastructure, advancements in cooling and power infrastructure technologies, and the increasing need for robust data security. However, challenges such as land scarcity, high construction costs, and regulatory hurdles could potentially restrain market growth to some extent. The market's competitiveness is shaped by a diverse range of companies, including global giants like IBM and AECOM and prominent local players like Sato Kogyo and Nakano Corporation. These companies are vying for a share of the expanding market by offering specialized services, leveraging technological advancements, and forming strategic partnerships. The focus will likely shift towards sustainable and energy-efficient data center designs, further driving market segmentation and technological innovation. The future growth will hinge on the continuous adoption of advanced technologies and addressing the challenges of scaling infrastructure while adhering to environmental regulations.
This in-depth report provides a comprehensive analysis of the China data center construction market, offering invaluable insights for investors, industry stakeholders, and strategic decision-makers. The report covers the period from 2019 to 2033, with a focus on the 2025-2033 forecast period. The base year for this analysis is 2025.

China Data Center Construction Market Market Concentration & Innovation
This section analyzes the competitive landscape of the China data center construction market, examining market concentration, innovation drivers, regulatory influences, and key industry trends. The market is characterized by a mix of both established international players and rapidly growing domestic companies. While precise market share figures for individual players are proprietary data within the full report, preliminary analysis suggests a moderately concentrated market with a few dominant players and a significant number of smaller, specialized firms.
Key Aspects Covered:
- Market Concentration: Analysis of market share distribution among leading players, utilizing metrics such as the Herfindahl-Hirschman Index (HHI) to quantify market concentration. xx% of the market is predicted to be held by the top 5 players in 2025.
- Innovation Drivers: Examination of factors driving innovation, including the increasing demand for hyperscale data centers, advancements in cooling technologies (e.g., liquid cooling), and the adoption of sustainable practices.
- Regulatory Landscape: Analysis of government policies, regulations, and incentives that shape market dynamics, including those related to energy efficiency, environmental protection, and data security.
- Product Substitutes & Alternatives: Evaluation of potential substitutes for traditional data center construction methods and technologies. This includes exploring modular data center approaches and prefabricated solutions.
- End-User Trends: Examination of changing end-user requirements and preferences across key sectors (IT & Telecommunication, BFSI, Government, Healthcare, and others), impacting the demand for specific data center features and capabilities.
- Mergers & Acquisitions (M&A) Activity: Review of recent M&A activity in the market, analyzing deal values and their impact on market consolidation. While precise deal values are detailed in the full report, preliminary analysis suggests xx Million in M&A activity in 2024.
China Data Center Construction Market Industry Trends & Insights
This section delves into the key trends and insights shaping the China data center construction market. It explores the market's growth trajectory, technological advancements, and competitive dynamics, providing a comprehensive overview of the market's evolution. The market is projected to experience robust growth throughout the forecast period, driven by factors such as the rising adoption of cloud computing, the proliferation of big data applications, and government initiatives promoting digitalization.
Key Trends:
- Market Growth Drivers: The report details multiple drivers such as the rapid expansion of e-commerce, the increasing penetration of 5G networks, and the government's "Digital China" initiative. A Compound Annual Growth Rate (CAGR) of xx% is projected between 2025 and 2033.
- Technological Disruptions: The emergence of technologies like artificial intelligence (AI), edge computing, and blockchain are discussed, highlighting their implications for data center design and construction.
- Consumer Preferences: The evolving preferences of end-users towards sustainable data centers, higher energy efficiency, and advanced security features are examined, influencing market trends.
- Competitive Dynamics: The report analyzes competitive strategies employed by key players, including partnerships, expansions, and technological advancements. Market penetration of key players is also analyzed.

Dominant Markets & Segments in China Data Center Construction Market
This section identifies the leading segments within the China data center construction market, analyzing their growth drivers and market dominance. While all segments contribute, certain ones exhibit significantly faster growth rates.
Dominant Segments:
- By Data Center Size: The Mega and Massive data center segments are expected to lead growth due to the increasing demand from hyperscale providers.
- By Infrastructure: Power Infrastructure and Cooling Infrastructure are vital components and show substantial demand. Evaporative cooling solutions, while still a significant segment, are predicted to exhibit a slower growth rate compared to more advanced cooling technologies.
- By End-User: The IT & Telecommunication and BFSI sectors are key drivers of demand. The government sector is also a significant contributor.
- By Tier Type: Tier III and Tier IV data centers are expected to dominate as businesses prioritize high availability and reliability.
Key Drivers (across segments):
- Strong government support for digital infrastructure development.
- Rapid growth of e-commerce and digital services.
- Increased investments from domestic and international companies.
- Expansion of cloud computing services.
China Data Center Construction Market Product Developments
The market showcases continuous innovation in cooling technologies, power solutions, and security systems, leading to enhanced efficiency and reliability. Modular designs are gaining traction, enabling faster deployment and reduced construction costs. The integration of AI and IoT within data centers is also driving advancements.
Report Scope & Segmentation Analysis
This report comprehensively segments the China data center construction market by data center size (Small, Medium, Large, Mega, Massive), infrastructure (Cooling Infrastructure, Power Infrastructure, Evaporative Cooling, Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, Other Infrastructure), end-user (IT & Telecommunication, BFSI, Government, Healthcare, Other End-User), and tier type (Tier I, Tier II, Tier III, Tier IV). Each segment’s growth projections, market size, and competitive dynamics are detailed in the full report.
Key Drivers of China Data Center Construction Market Growth
The market's growth is propelled by surging demand for data storage and processing, fueled by the rapid expansion of cloud services, e-commerce, and the government's initiatives promoting digital transformation. The increasing adoption of AI and big data analytics further exacerbates this demand.
Challenges in the China Data Center Construction Market Sector
The market faces challenges including securing sufficient land for large-scale data centers, navigating complex regulatory approvals, and managing supply chain constraints, particularly for specialized components. These factors can lead to project delays and increased costs, impacting the overall market growth.
Emerging Opportunities in China Data Center Construction Market
Opportunities arise from the growing adoption of sustainable and energy-efficient technologies in data center construction, increasing demand for edge computing infrastructure, and the expansion of data center services into less-developed regions of China.
Leading Players in the China Data Center Construction Market Market
- SAS Institute Inc
- Aueron Group
- JE Dunn Construction Group Inc
- Kienta Engineering Construction
- DSCO Group
- IBM Corporation
- Sato Kogyo (S) Pte Ltd
- Nakano Corporation
- Turner Construction Co
- DPR Construction Inc
- Hensel Phelps Construction Co Inc
- Obayashi Corporation
- CSF Group
- Gammon Construction Limited
- M+W Group GmbH
- AECOM
- NTT Ltd
Key Developments in China Data Center Construction Market Industry
- February 2023: CapitaLand Investment Limited announced the construction of hyperscale data centers in Greater Beijing, aiming to deliver over 100MW by 2025 and achieve LEED Gold certification.
- January 2022: Beijing Highlander Digital Technology Co Ltd. announced the construction of an USD 880 Million commercial underwater data center, aligning with the country's sustainability goals.
Strategic Outlook for China Data Center Construction Market Market
The China data center construction market is poised for continued expansion, driven by strong government support, increasing digitalization, and the growing adoption of advanced technologies. The focus on sustainability and energy efficiency presents significant opportunities for innovative companies. The market's long-term outlook is positive, with substantial growth potential in the coming years.
China Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Infrastructure
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.1.5. Racks
- 1.2.1.6. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Infrastructure
-
2.2. Power Back-up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Infrastructure
-
4. Power Back-up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.1.5. Racks
- 6.1.6. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 7.5. Racks
- 7.6. Other Mechanical Infrastructure
- 8. General Construction
-
9. Tier Type
- 9.1. Tier 1 and 2
- 9.2. Tier 3
- 9.3. Tier 4
- 10. Tier 1 and 2
- 11. Tier 3
- 12. Tier 4
-
13. End User
- 13.1. Banking, Financial Services, and Insurance
- 13.2. IT and Telecommunications
- 13.3. Government and Defense
- 13.4. Healthcare
- 13.5. Other End Users
- 14. Banking, Financial Services, and Insurance
- 15. IT and Telecommunications
- 16. Government and Defense
- 17. Healthcare
- 18. Other End Users
China Data Center Construction Market Segmentation By Geography
- 1. China

China Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 3.54% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Increasing Demand for Supercomputing; Phenomenal Growth in E-commerce and Hi-tech Industries; Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure
- 3.3. Market Restrains
- 3.3.1. High Power Consumption and emission contribution of Data Centers
- 3.4. Market Trends
- 3.4.1. Tier-3 is the largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. China Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Infrastructure
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.1.5. Racks
- 5.1.2.1.6. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Infrastructure
- 5.2.2. Power Back-up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Infrastructure
- 5.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.1.5. Racks
- 5.6.1.6. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.7.5. Racks
- 5.7.6. Other Mechanical Infrastructure
- 5.8. Market Analysis, Insights and Forecast - by General Construction
- 5.9. Market Analysis, Insights and Forecast - by Tier Type
- 5.9.1. Tier 1 and 2
- 5.9.2. Tier 3
- 5.9.3. Tier 4
- 5.10. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.11. Market Analysis, Insights and Forecast - by Tier 3
- 5.12. Market Analysis, Insights and Forecast - by Tier 4
- 5.13. Market Analysis, Insights and Forecast - by End User
- 5.13.1. Banking, Financial Services, and Insurance
- 5.13.2. IT and Telecommunications
- 5.13.3. Government and Defense
- 5.13.4. Healthcare
- 5.13.5. Other End Users
- 5.14. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.15. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.16. Market Analysis, Insights and Forecast - by Government and Defense
- 5.17. Market Analysis, Insights and Forecast - by Healthcare
- 5.18. Market Analysis, Insights and Forecast - by Other End Users
- 5.19. Market Analysis, Insights and Forecast - by Region
- 5.19.1. China
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 SAS Institute Inc
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Aueron Group
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 JE Dunn Construction Group Inc
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Kienta Engineering Construction
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 DSCO Group
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 IBM Corporation
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Sato Kogyo (S) Pte Ltd
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Nakano Corporation
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Turner Construction Co
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 DPR Construction Inc
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Hensel Phelps Construction Co Inc
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Obayashi Corporation
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 CSF Group
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Gammon Construction Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 M+W Group GmbH
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 AECOM
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 NTT Ltd
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.1 SAS Institute Inc
List of Figures
- Figure 1: China Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: China Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: China Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: China Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: China Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: China Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: China Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: China Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: China Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: China Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: China Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 10: China Data Center Construction Market Volume K Unit Forecast, by Power Back-up Solutions 2019 & 2032
- Table 11: China Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: China Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: China Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: China Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: China Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: China Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: China Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 18: China Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 19: China Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 20: China Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 21: China Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 22: China Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 23: China Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 24: China Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 25: China Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 26: China Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 27: China Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 28: China Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 29: China Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 30: China Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 31: China Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 32: China Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 33: China Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 34: China Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 35: China Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 36: China Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 37: China Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 38: China Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 39: China Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 40: China Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 41: China Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 42: China Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 43: China Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 44: China Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 45: China Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 46: China Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 47: China Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 48: China Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 49: China Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 50: China Data Center Construction Market Volume K Unit Forecast, by Power Back-up Solutions 2019 & 2032
- Table 51: China Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 52: China Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 53: China Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 54: China Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 55: China Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 56: China Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 57: China Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 58: China Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 59: China Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 60: China Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 61: China Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 62: China Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 63: China Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 64: China Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 65: China Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 66: China Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 67: China Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 68: China Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 69: China Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 70: China Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 71: China Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 72: China Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 73: China Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 74: China Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 75: China Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 76: China Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 77: China Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 78: China Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 79: China Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 80: China Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the China Data Center Construction Market?
The projected CAGR is approximately 3.54%.
2. Which companies are prominent players in the China Data Center Construction Market?
Key companies in the market include SAS Institute Inc, Aueron Group, JE Dunn Construction Group Inc, Kienta Engineering Construction, DSCO Group, IBM Corporation, Sato Kogyo (S) Pte Ltd, Nakano Corporation, Turner Construction Co , DPR Construction Inc, Hensel Phelps Construction Co Inc, Obayashi Corporation, CSF Group, Gammon Construction Limited, M+W Group GmbH, AECOM, NTT Ltd.
3. What are the main segments of the China Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back-up Solutions, Service , Mechanical Infrastructure, Cooling Systems, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Increasing Demand for Supercomputing; Phenomenal Growth in E-commerce and Hi-tech Industries; Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure.
6. What are the notable trends driving market growth?
Tier-3 is the largest Tier Type.
7. Are there any restraints impacting market growth?
High Power Consumption and emission contribution of Data Centers.
8. Can you provide examples of recent developments in the market?
February 2023: CapitaLand Investment Limited announced to construction of hyperscale data centers in Greater Bejing with CapitaLand China Data Centre Partners (CDCP) and deliver more than 100MW by 2025. The construction aims to support sustainability by acquiring certification from Energy and Environmental Design (LEED) Gold standards. Thus providing opportunities for the vendors in the market.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "China Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the China Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the China Data Center Construction Market?
To stay informed about further developments, trends, and reports in the China Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence